Wednesday 16 March 2011

Risk Assesment

I'm uploading this a little late, but this was the risk assesment we prepared before filming...

FILM PRODUCTION RISK ASSESSMENT

Production Title
Starship Productions
Production Date(s)
February 2011 – April 2011
Producers Names
Lizzie Smith, Shereen Sagoo and Kayleigh Turner
Directors Names
Lizzie Smith, Shereen Sagoo and Kayleigh Turner
Date of Risk Assessment
9h February 2011
Risk Assessment conducted by
Lizzie Smith, Shereen Sagoo and Kayleigh Turner


Hazard
Persons who may be harmed
Property which may be damaged
Risk controls already in place
Risk Assessment LOW, MODERATE, HIGH, EXTREME
(see table)
Further action required to control risk


Driveway/cars
All actresses and directors



Camera equipment
Pavement at the side of driveway and roundabout
Unlikely
High
Warn all persons to take extra care.

Trolley for filming
Directors



N/A
Handle to control the wheels of the trolley
Unlikely
Low
Warn all persons to take extra care.


Temperature/weather
All actresses and directors



Camera equipment could get wet
None
Unlikely/Moderate
Low
Check weather forecast, ensure actresses are dressed appropriately


Road outside
One actress and directors



Camera equipment
Pavement
Rare
high
Warn all persons to take extra care.






No comments:

Post a Comment